|
SOLIDIFICATION
PHOTOS FROM WEEK OF AUGUST 17, 2009
Solidification, screened material placement, east end of the Containment Area, initial lift - 8/20/09 Solidification, introduction of lime kiln dust, initial lift, east end of the Containment Area - 8/20/09 Solidification, initial loose lift of screened material, east end of the Containment Area - 8/20/09 Solidification, initial lift thickness, east end of the Containment Area - 8/20/09 Placement of oversized material from screening operation in Area H into west end of the Containment Area, looking north -8/21/09 Compressive strength testing, initial solidification layer (approximately 9-inch depth), east end of the Containment Area - 8/21/09 Compressive strength testing, initial solidified lift, taking a penetrometer reading - 8/21/09 Containment Area (CA) grading and material relocation, west end of the CA, looking northwest from the south swale - 8/18/09
Solidification, screened material placement, east end of the Containment Area, initial lift - 8/20/09
Click here to learn more about current project information and the Schedule
|