Gas Vent (GV-1) installation, excavation and loading of material - 11/3/09
Gas Vent (GV-1) installation, complete excavation to 5-feet - 11/3/09
Gas Vent (GV-1) installation, securing initial geotextile piece - 11/3/09
Gas Vent (GV-1) installation, geotextile and pea gravel placement - 11/3/09
Gas Vent (GV-1) installation, pipe placement - 11/3/09
Gas Vent (GV-1) installation, secondary piece of geotextile over gravel - 11/3/09
Gas Vent (GV-1) installation, complete pea gravel placement to 2-feet below solidified layer - 11/3/09
Gas Vent (GV-1) installation, cap cover soil placement - 11/3/09
Gas vent (GV-1) installation, compaction of cap cover soil - 11/4/09
Removal of saturated material along interior Containment Area (CA) berm, southern side of CA, looking southeast - 11/3/09