Milestones Reached!  Excavation of contaminated fill material is completed and all surface soils at the Site are below the clean-up standard. See Construction Information page for details. 
 
Home

Site Background

Summary of Corrective Measures Implementation (CMI) Process

Construction Schedule and Information

Final (100%) Remedial Design

Air Data

Stormwater Management System

Photo Gallery

Quarterly Progress Reports & Monitoring

Community Relations

Documents

FAQs

Contact Us

Web Site Map

Incident Report – Water Line Pierced – September 12, 2008

During construction activities at the Marjol Site today, when grubbing (removing roots and grass) in an area along the Sulphur Creek side of the Site, the water line that runs through the property was pierced.  Note: This water line was relocated in 1998 so that it runs outside the area of contamination.  The area where the line was pierced was a clean (non-contaminated) area, so there was no threat of a release of contaminated material at any time.  Pennsylvania American Water Company (PAWC) was on-site and shut the water line down before and after the pierce location in order to repair the line.  PAWC was able to reroute water flow so that residents are not without water.  Water at the Site is turned off and PAWC will return on Monday, September 15, 2008 to do additional repair work.

 

Page Last Modified Thursday November 12, 2009 12:32:09 PM

 

 

 

 

 

 

 

 

 

 

502 George Street | Throop, PA 18512 | tel 570.383.9313 | fax 570.383.9309 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices